3-tab asphalt shingle roof replacement cost in Cleveland, OH

A 3-tab asphalt shingle roof in Cleveland models at $10,200 – $22,500 at the Better specification, using measured local wage data and a 0.98× labour index. This is a baseline for a standard property — your roofline, access and existing conditions move it.

Price my roof replacement
Confidence: High confidence · 88/100 for this generic case
Good

$8,900 – $19,600

Around $12,700 · 13 days elapsed

Better

$10,200 – $22,500

Around $14,500 · 14 days elapsed

Best

$14,900 – $38,300

Around $23,300 · 28 days elapsed

What drives the price in Cleveland

Labour index 0.98 · material index 0.97 · permit index 0.95. Labour rates derived from published wage data for Cleveland, OH (measured).

  • Install new roof covering$3,500 – $5,800
  • Tear off existing roofing$1,000 – $2,000
  • Install drip edge$500 – $1,100
  • Install ice-and-water shield at eaves and valleys$600 – $1,000
  • Install underlayment$500 – $1,000

Contractor overhead and profit is shown separately at 25%, contingency at 8%. How the confidence score works.

12 conditions that change this number

2 already apply to the baseline case below. The rest depend on answers only you can give.

  • Two or more existing layers
  • Three existing layers
  • Steep pitch
  • Three or more storeys
  • Sheathing replacement expected
  • Sheathing condition unknown
  • Cold climate ice barrier
  • Low slope with shingles
What the job involves
  1. Setup & protection0.5 days
  2. Tear-off & disposal1.4 days
  3. Deck repair0.5 days
  4. Install new roof3 days
  5. Cleanup & inspection0.5 days

Roof area is the sloped surface area, not the building footprint.

The same project in other metros

Get this priced for your actual house

Answer six questions and the range narrows to your roof, your access, your conditions.

Planning estimate only. This is not a quote, bid or appraisal. Ranges reflect typical market conditions for the stated data version and do not account for site-specific concealed conditions, local code interpretation or contractor availability. Always obtain written bids. Data version v2026.1. Last updated . Methodology.