Skip to content

Confidence score

How sure is this estimate, really?

Every Renolume estimate carries a score out of 100, a band, and a range that widens as certainty falls. It is the number we would most like you to read first.

The three bands

  • High

    Narrowest range

    Rich inputs and a measured local wage sample. Suitable for setting a working budget and testing bids against.

  • Moderate

    Wider range

    Enough to budget with, but some conditions are assumed rather than known. Expect movement once a contractor inspects.

  • Preliminary

    Widest range

    Thin inputs or no local wage sample. Useful for orientation and go / no-go thinking, not for committing funds.

What the score is built from

  • Input completenessHow many of the questions that materially move cost you actually answered.
  • Location resolutionWhether we matched a measured metro wage sample, a state average, or nothing at all.
  • Wage sample qualityWhether the local wage series is measured or interpolated from neighbouring areas.
  • Condition certaintyWhether existing-condition answers were observed by you or assumed by the model.
  • Scope stabilityHow many high-variance rules fired — the conditions most likely to change on inspection.

Why the range widens

A low confidence score does not mean the expected value is wrong — it means the spread around it is genuinely larger. Rather than quietly presenting a precise-looking figure, Renolume applies a wider low-to-high spread and says which band you are in. A confident-looking number built on three answers is the most expensive kind of mistake in renovation planning.

The Preliminary cap

If we cannot match your location to a measured local wage sample, the estimate is capped at Preliminary no matter how complete your other answers are. Labour is the largest and most local component of nearly every project; without a real local sample, precision would be theatre.

How to raise it

Every estimate lists the specific answers that would raise its score, with the points each would add — usually a ZIP code, an existing-condition detail, or an access constraint you already know.

See a confidence score on your own project

Answer eight short steps and get the range, the reasoning and the score together.

Choose a project type