Deck Construction cost in Dallas, TX

A typical deck construction in Dallas, Texas models at $13,700 – $29,100, with a mid point around $19,700. Dallas carries a labour index of 0.96, a material index of 0.99 and a permit index of 0.9 against the national base, in climate zone 2A with a 6 in frost depth. That is a whole-job model — 11 scoped tasks, 27 days elapsed, 21% contractor overhead and profit and 8% contingency — not a per-unit rate multiplied out. Renolume states 100/100 confidence (High confidence) for a standard property here.

Model my deck construction
Confidence: High confidence · 100/100 for this generic case

Modelled by the Renolume estimating model · engine 2.0.0, data v2026.1 · Last updated . Every figure on this page is produced by the Renolume engine at the stated engine and data version. Nothing is scraped, crowd-sourced or supplied by a contractor, and no figure is edited by hand after the model runs.

What drives deck construction cost in Dallas

Why this job is priced differently in Dallas than anywhere else. Everything below is local: the wage base, the supply chain, the permit regime and the weather the assembly has to survive.

Local cost basis — Dallas, Texas
Local factorValue usedWhat it means for your quote
Labour market0.96× national baseDallas–Fort Worth has one of the largest and most competitive residential trade markets in the country, spread across two urban cores and a very wide suburban ring. Rates are below the national basis and quote quality varies accordingly.
Material supply0.99× national baseCovers freight distance and local supply depth. It moves less than labour, but it moves.
Permit regime0.90× national basePermitting is comparatively fast and inexpensive, but it is administered by a large number of separate municipalities with their own requirements for roofing and exterior replacement.
Climate exposureZone 2A · frost 6 inClimate zone 3A on the northern edge of the hot-humid band: long hot summers, high UV, occasional hard freezes and one of the highest hail frequencies of any large US metro. Frost depth is shallow at roughly 6 inches.
Wage sample qualitymeasuredA measured wage sample for CBSA 19100, which is why this city page is published and indexed.

Hail frequency

Impact-rated assemblies are a mainstream decision here and can affect insurance treatment as well as survival.

Heat and UV

Sustained summer attic temperatures and high UV shorten the life of low-grade materials and make ventilation cost-relevant.

Storm-cycle demand

Prices and lead times move sharply after a hail event, independently of the underlying cost base.

Municipal fragmentation

Dozens of separate authorities across the metroplex, each with their own process and requirements.

Permits, inspections and scheduling in Dallas

Permits, inspections, crew availability and season in Dallas — the part of a project that has nothing to do with the material you pick.

Permitting

Permitting is comparatively fast and inexpensive, but it is administered by a large number of separate municipalities with their own requirements for roofing and exterior replacement.

Modelled permit allowance for this job: $100 – $700.

Inspections

Inspection focuses on fastening schedules, wind resistance and, where relevant, impact-rated assemblies. Documentation matters for insurance treatment as much as for the building department.

3 days of inspection wait is modelled inside the 21 days–70 days elapsed window.

Contractor availability

Very deep pool, with severe compression after hail. The post-storm influx of out-of-area crews is a recurring local problem and licence verification is essential.

Season and weather

Year-round working season with two constraints: mid-summer surface heat that shortens productive hours, and a spring storm season that drives both damage and demand.

2 day(s) of weather buffer are carried for this metro.

Deck Construction in Dallas: Shallow frost depth keeps foundations cheap, while UV and heat make coating maintenance intervals the real ownership cost.

Planning deck construction in Dallas: what local homeowners should know

Planning guidance written for Dallas specifically — the answers change city by city because the labour market, the code regime, the climate and the access conditions do.

Why might deck construction cost more in Dallas?

The metroplex has a low cost base — plentiful labour, cheap permits, no frost work — and a high-variance market on top of it. What raises a quote is specification rather than geography: impact-rated materials, upgraded fastening for wind, and proper ventilation. What raises it unpredictably is timing, because after a significant hail event the market prices on scarcity rather than cost.

What causes delays in Dallas?

Summer heat cuts productive hours on a roof surface, so warm-month jobs run longer than their nominal duration. The dominant delay, though, is the post-storm queue: after hail, every crew in the region is committed and insurance adjustment adds its own timeline on claim-driven work.

Which materials perform better in the Dallas climate?

Specify for hail, wind, heat and UV — in that order. Impact classification is the decision with the clearest return in this metro, ventilation is what keeps a heat-loaded assembly alive to its rated life, and solar control is the glazing number that matters because cooling is the season that costs money. Cold-climate detailing is largely irrelevant here.

When is the best time to schedule the work here?

Autumn through early spring gives full working days, no heat penalty and distance from the spring storm peak. If hail has just passed, waiting is usually the better financial decision unless the assembly is actively failing.

What should you know before requesting quotes in Dallas?

Confirm which municipality you are in, get impact rating quoted explicitly as an option, and check how your insurer treats it. Verify state licensing and a genuine local address before signing — post-storm door-knocking is a persistent problem in this metro — and make sure ventilation scope is written into the quote rather than assumed.

What surprises homeowners in Dallas?

Homeowners are most often surprised by how far the same job's price moves between a quiet month and a post-hail month, and by ventilation deficiencies discovered during a replacement that explain why the previous assembly failed early.

None of this changes the scope of the job — it changes what the job costs and how long it takes here. Model your own deck construction in Dallas to replace these standard-property assumptions with your roof pitch, access, condition and specification, and to raise the confidence score this page reports.

Decking material comparison

Cost, service life, upkeep, efficiency and installation difficulty side by side — the trade-off, not just the price.

Modelled cost by decking material — Dallas, TX, same scope and property
Decking materialModelled costStep upRate per sq ftElapsed time
Pressure-treated pine$14,000 – $29,400baseline$44 – $9228 days
Capped composite$13,700 – $29,100−$400$43 – $9127 days
Hardwood or PVC$13,700 – $29,100−$400$43 – $9127 days
Decking material characteristics — what you are actually buying
Decking materialService lifeMaintenanceEnergyInstallationPlanning note
Pressure-treated pine10–15 years for the surfaceHighest. Clean and re-seal every one to three years or it greys, checks and splinters.n/aLowest. Universally available and stocked.Lowest cost today, highest cost over twenty years once upkeep is counted.
Capped composite25–30 yearsLow. Wash only; no sealing cycle.n/aLow, but hidden-fastener systems slow installation slightly.The default choice. Dark boards get notably hot underfoot in full sun.
Hardwood or PVC25–50 yearsModerate for hardwood (oiling), very low for PVC.n/aHighest. Hardwood needs pre-drilling and skilled labour.Specify for appearance and longevity; confirm fastener and joist spacing requirements up front.

Cost by size in Dallas, TX

Every row is a separate run of the same model at the same specification — only the size changes. Note how the per sq ft rate falls as the job grows: fixed costs like permits, mobilisation and disposal setup do not scale with size.

Modelled deck cost by size — Dallas, TX
Deck sizeTypicallyModelled costRate per sq ftElapsed time
10 x 12 ft (120 sq ft)small landing or grill deck$8,200 – $17,800$69 – $14825 days
12 x 16 ft (192 sq ft)table for four plus circulation$10,200 – $21,900$53 – $11426 days
16 x 20 ft (320 sq ft)the most common family deck$13,700 – $29,100$43 – $9127 days
20 x 24 ft (480 sq ft)dining and lounge zones together$18,300 – $38,800$38 – $8130 days
24 x 30 ft (720 sq ft)large multi-use deck$25,400 – $54,000$35 – $7533 days

Why deck construction costs what it does in Dallas compared with other metros

Identical scope, identical specification, priced against each metro's own wage sample. Dallas models below the 11-metro average of $19,800 – $24,200, because of low labour and permit base offset by hail-driven specification upgrades and post-storm market volatility.

Modelled deck construction cost by metro — identical scope, with the local reason for the difference
MetroModelled costLabour indexElapsed timeWhy it sits here
Dallas, TX (this page)$13,700 – $29,1000.9627 dayslow labour and permit base offset by hail-driven specification upgrades and post-storm market volatility
Cleveland, OH$13,600 – $29,4000.9827 dayslabour, material and permit indices all near the national base, with condition risk from older housing stock
Houston, TX$13,800 – $29,3000.9327 daysdeep competitive labour pool and the lowest permit burden modelled, offset by wind-resistance scope
Atlanta, GA$13,900 – $29,7000.9527 dayscompetitive labour, negligible frost work and a moderate permit burden across a highly fragmented jurisdictional map
Detroit, MI$14,100 – $30,3001.0227 daysnear-national labour rates carrying genuinely severe cold-climate detailing requirements and older housing stock
Denver, CO$14,800 – $32,2001.0627 daysmid-range labour rates with hail-driven specification requirements and claim-cycle market volatility
Philadelphia, PA$15,200 – $33,3001.1427 daysabove-average unionised labour rates combined with attached-housing scope and historic-district constraints
Chicago, IL$15,700 – $34,5001.1827 dayshigh union labour base plus code-driven cold-climate detailing
Seattle, WA$16,200 – $35,7001.2427 dayshigh burdened labour rates, long permit and contractor lead times, and an energy code that sets a specification floor
New York, NY$17,600 – $39,6001.3827 dayslogistics, insurance and filing procedure on top of the highest permit index modelled
San Francisco, CA$18,100 – $40,7001.4227 dayshighest modelled wage base, slow permit throughput and compliance-driven specification floors

The spread is not arbitrary. Dallas sits at the bottom of this table because of low labour and permit base offset by hail-driven specification upgrades and post-storm market volatility, while San Francisco sits at the top because of highest modelled wage base, slow permit throughput and compliance-driven specification floors. Scope, task list and specification are identical in every row — what changes between cities is what it costs to staff, supply, permit and access the same job.

See the national deck construction model for the full picture across every modelled metro, or read how the regional indices are built.

What is actually in the job

The task list below is the same in every city; what changes in Dallas is what it costs to staff, supply, permit and access — low labour and permit base offset by hail-driven specification upgrades and post-storm market volatility.

Scope breakdown

Labour $2,500 – $4,700 · materials $8,500 – $14,700 · other costs $100 – $900 · overhead and profit $1,700 – $5,700 · contingency $800 – $3,100. 80.5 modelled labour hours across 3 trades.

  • Install decking boards$3,900 – $6,200
  • Frame beams, joists and blocking$2,300 – $4,500
  • Install guardrail system$2,000 – $3,700
  • Form, pour and set footings and posts$800 – $1,600
  • Build stairs and handrail$600 – $1,200

Other costs most quotes omit

  • Building permit$100 – $700
  • Footing and final inspection fees$0 – $200

Regional movement: labour index 0.96 · material index 0.99 · permit index 0.9. Labour rates derived from published wage data for Dallas, TX (measured).

How long deck construction takes in Dallas

21 days to 70 days elapsed

6.3 days of active work, 13 days of waiting (permits, inspections, weather), and material lead time of 7 days28 days.

  1. Layout, permit & demolition0.5 days
  2. Excavation & footings1.1 days + 5 days wait
  3. Framing1.5 days + 3 days wait
  4. Decking1.6 days
  5. Railing & stairs1.1 days
  6. Finishing & inspection0.5 days + 3 days wait

Dallas–Fort Worth timelines are driven by hail season and summer heat rather than by administrative process, which is comparatively quick here.

Why this number

12 named conditions can change this estimate. 4 already apply to the standard case, and each one is shown with its cause and its effect. Which of them fire in Dallas is shaped by local conditions — see the Dallas planning guidance above.

Rules applied to this estimate
  • Guardrail required above 30 in

    • Adds “Install guardrail system” to the scope
    • A guardrail is required where the walking surface is more than 30 in above grade.
  • Stairs required

    • Adds “Build stairs and handrail” to the scope
  • Attached deck

    • Ledger flashing is the most common cause of deck failure; insist on inspection before decking is laid.
  • Hidden fasteners on composite

    • Adds “Hidden fastener clip system” to the scope
    • Increases labour on Install decking boards by 22%
Conditions that would change your price
  • Guardrail required above 30 in
  • Elevated deck
  • Stairs required
  • Rock excavation
  • Clay soil
  • Deep frost line
  • Attached deck
  • Freestanding deck
  • Existing deck removal
  • Hidden fasteners on composite
  • Pressure-treated finishing
  • Lighting selected

Confidence score: 100/100 (High confidence)

Renolume publishes how much to trust the number instead of hiding the uncertainty. This page scores a standard property; answering the planner questions raises the score because the model has more to work with. Wage data is measured and the cost base is stable, but the market clears at very different prices before and after a storm event, and impact-rated specifications sit above the modelled default.

  • Location precisionmeasured20/20
  • Dimensions supplied3/325/25
  • Existing-condition information3/320/20
  • Material & option selections6/615/15
  • Structural / utility / concealed risknone flagged20/20

How the confidence score is calculated

How this estimate is produced

No contractor supplies these prices, no figure is scraped, and no number is crowd-sourced. Here is the whole chain.

From published wage data to the number on this page
StepWhat happensWhy it matters to you
1. ScopeA fixed task library breaks the job into discrete tasks with a trade, a crew size and a productivity rate. This job models 80.5 labour hours across 3 trades.Nothing is priced that is not described. You can see every task and argue with any of them.
2. LabourHours are priced against published government occupational wage data, burdened for payroll costs and scaled to Dallas, Texas by a labour index of 0.96.The regional difference is an index you can see, not a guess folded into a national average.
3. MaterialsQuantities are derived from your inputs with waste factors, then priced at the selected specification and scaled by a material index of 0.99.Changing specification changes the material line only — the labour model does not silently move.
4. Other costsPermits, disposal, protection and equipment, with a permit fee index of 0.9.These are the lines most quotes leave out and most homeowners discover late.
5. Overhead and contingency21% contractor overhead and profit, then 8% contingency for conditions nobody can see before the job is opened up.A real business has to cover both. Estimates that omit them are structurally too low.
6. ConfidenceThe model scores how much it actually knows about your property and widens the displayed range when it knows less.You are told how much to trust the number instead of being given false precision.

Engine version 2.0.0, data version v2026.1, effective 2026-04-01. Full methodology · How the confidence score works

Why two honest quotes can differ this much

Modelled spread on this job is $13,700 – $29,100. Real quotes often spread wider, and it is rarely because one contractor is dishonest.

Legitimate reasons two bids on the same house differ
ReasonWhat it looks like on the quote
Different scopeOne bid includes disposal, permits and finishing; the other assumes you handle them. Same headline job, different work.
Different specificationGrade of new deck components — the accessories, not the headline product — is where most silent savings are made.
Different risk appetiteA firm carrying a real contingency prices higher and change-orders less. A firm carrying none does the reverse.
Different overheadLicensed and insured crews with warranty support and office staff cost more to run than a truck and two people.
Different backlogA busy contractor prices to be worth interrupting the schedule. The same firm bids differently in the off season.
Different assumptions about the unknownWhoever assumes the least concealed damage looks cheapest on paper and is the most likely to change-order.

The practical defence is to compare on scope lines rather than totals. Use the breakdown above as the checklist, and ask any bidder missing a line whether it is excluded or simply unpriced.

Repair or replace?

The decision before the budget. Renolume has no reason to push you toward the larger job.

Repair versus replace — decision signals
What you are seeingWhat it usually means
Surface boards are worn but framing is soundRe-deck only. Keeping the frame and replacing the surface is far cheaper than a full rebuild.
Posts or joists are soft at the ground or the ledgerReplace. Structural rot cannot be surfaced over.
Ledger has no visible flashingInvestigate immediately. This is a safety issue, not a cosmetic one.
Deck is a different size than you now needRebuild. Extending an existing frame rarely costs less than building right.

Planning a new deck

The parts of a new deck that a cost table cannot tell you.

Permits and inspections drive the calendar

Most attached decks are permitted work with a footing inspection before concrete and a framing inspection before decking. Those two hold points, not the carpentry, are what stretch a deck project across weeks.

Frost depth is a real cost line

Footings must reach below the local frost line. In a cold-climate metro that can mean four feet of excavation per pier; in a warm one, a fraction of that. Same deck, materially different groundwork.

Terms on your quote, defined

The handful of terms that appear on every quote and change what you are comparing.

Ledger
The board attaching the deck to the house. Bad ledger flashing is the leading cause of deck collapse and of wall rot behind the deck.
Footing
The concrete pier carrying each post, taken below the local frost line. Frost depth is climate-set and drives excavation cost.
Guardrail trigger
Decks above roughly 30 in from grade require a code-compliant guardrail. The height threshold changes the price step, not the deck size.
Joist spacing
Composite and diagonal board layouts often require tighter joist spacing than pressure-treated, which adds framing before any decking is laid.

DIY versus contractor

Up to $0 of labour is owner-doable

Savings are labour only — materials, disposal and permits do not change.

You could take on

  • Excavate footings (advanced)
  • Install decking boards (moderate)
  • Hidden fastener clip system (moderate)
  • Fascia, skirting and trim (moderate)

Leave to a licensed contractor

  • Layout, string lines and permit coordinationLicensed or code-regulated work
  • Form, pour and set footings and postsStructural footings and inspection sign-off
  • Install ledger board and flashingPrimary structural connection to the house
  • Frame beams, joists and blockingStructural framing
  • Install guardrail systemGuardrail load requirements
  • Build stairs and handrailRise/run code compliance
  • Punch list and final inspectionLicensed or code-regulated work

Owner-performed roof work is a poor fit where impact rating and insurance documentation matter, and summer roof-surface temperatures are a genuine safety limit.

Model your own deck construction in Dallas

Everything above prices a standard property. Your house is not a standard property, and the difference is usually larger than the difference between cities. The deck construction planner runs the same engine on your inputs and returns a cost range, an itemised scope, a phased timeline, Good/Better/Best options and a confidence score that rises as you answer.

What changes when you model your own property in Dallas
  • Size, condition and access replace the standard-property defaults behind the $13,700 – $29,100 range on this page.
  • 12 named conditions are re-tested against your answers instead of assumed away — each one shown with its cause and its effect.
  • The confidence score moves off 100/100, because the model is working from your inputs rather than Dallas averages.
  • Local context is carried through: Confirm which municipality you are in, get impact rating quoted explicitly as an option, and check how your insurer treats it.

Open the deck construction planner for Dallas — it takes a few minutes, nothing is emailed to a contractor, and you can save and compare scenarios side by side afterwards.

Key takeaways

  • Deck construction in Dallas, TX models at $13,700 – $29,100, mid point $19,700 at the Better specification.
  • Expect 21 days to 70 days elapsed, of which only 6.3 days is active work.
  • The model states 100/100 confidence for a standard property, and 12 named conditions can move the number.
  • Dallas prices differently from other metros because of low labour and permit base offset by hail-driven specification upgrades and post-storm market volatility.
  • 21% contractor overhead and profit and 8% contingency are inside the range — a quote without them is not cheaper, it is incomplete.
  • Framing and footings, not decking boards, are the majority of a deck budget.
  • Height above grade sets whether guardrails are required and is a genuine price step.
  • Pressure-treated is cheapest to build and most expensive to own.
  • If the frame is sound, re-decking beats rebuilding by a wide margin.

Questions homeowners ask before hiring

How much does a deck construction cost in Dallas?

A deck construction on a standard property in Dallas, Texas models at $13,700 – $29,100 at the Better specification, with a mid point around $19,700. That figure is a whole-job model — labour, materials, 2 other cost lines, 21% contractor overhead and profit and 8% contingency — not a per-unit line item multiplied out.

Which material makes the most sense in Dallas?

In Dallas the same scope models at $14,000 – $29,400 with pressure-treated pine and $13,700 – $29,100 with hardwood or pvc, so material is the largest choice you control on this project. Shallow frost depth keeps foundations cheap, while UV and heat make coating maintenance intervals the real ownership cost. This page compares every modelled option side by side; each material has its own page setting out service life, upkeep and the cases where it is the wrong choice.

Why does a deck construction cost more or less in Dallas than the national average?

Three published indices explain almost all of it: a labour index of 0.96 against the national wage base, a material index of 0.99 covering freight and local supply, and a permit fee index of 0.9. Dallas–Fort Worth has one of the largest and most competitive residential trade markets in the country, spread across two urban cores and a very wide suburban ring. Rates are below the national basis and quote quality varies accordingly. Nothing about the job itself changes between cities — only what it costs to staff, supply and permit it.

Do I need a permit for a deck construction in Dallas?

Permitting is comparatively fast and inexpensive, but it is administered by a large number of separate municipalities with their own requirements for roofing and exterior replacement. A permit line is modelled into this estimate at $100 – $700, scaled by the Dallas permit fee index of 0.9. Treat it as a budgeted allowance and confirm the exact requirement with your local building department before work starts — an unpermitted job can create problems at resale.

What will the inspector check in Dallas?

Inspection focuses on fastening schedules, wind resistance and, where relevant, impact-rated assemblies. Documentation matters for insurance treatment as much as for the building department. Renolume models 3 days of inspection wait inside the 27 days elapsed timeline, because the waiting — not the inspection itself — is what shows up on your calendar.

How hard is it to get a good contractor in Dallas?

Very deep pool, with severe compression after hail. The post-storm influx of out-of-area crews is a recurring local problem and licence verification is essential. Whatever the local market, compare bids on scope lines rather than on the total: this page lists 11 modelled tasks and 2 other cost lines, and a bid that is missing several of them is not cheaper, it is incomplete.

When is the best time of year to schedule a deck construction in Dallas?

Year-round working season with two constraints: mid-summer surface heat that shortens productive hours, and a spring storm season that drives both damage and demand. Renolume carries 2 day(s) of weather buffer for this metro inside the modelled elapsed window of 21 days to 70 days. Off-peak scheduling more often shortens lead time than it lowers price.

How long does a deck construction take in Dallas?

Renolume models 6.3 days of active work and 13 days of waiting — permits, inspections, material lead time and weather buffer — for a total elapsed window of 21 days to 70 days. Crews on site is the short part; the calendar is dominated by what happens between phases.

What are the hidden costs of a deck construction in Dallas?

The costs most quotes leave out are already in this model: Footing and final inspection fees ($0 – $200). On top of that, 8% contingency is carried for conditions nobody can see until the job is opened up, and these are explicitly excluded: Retaining walls, grading or drainage work; Roof structures, pergolas and screening; Hot tub structural reinforcement.

Can I do a deck construction myself, or do I need a contractor?

Renolume models $0 to $0 of labour that a capable owner could take on — typically Excavate footings, Install decking boards, Hidden fastener clip system. These stay with a licensed contractor: Layout, string lines and permit coordination, Form, pour and set footings and posts, Install ledger board and flashing, because of code, insurance or safety exposure. DIY savings are labour only; materials, disposal and permits do not change.

How deep do deck footings need to go in Dallas?

Below the local frost line, which is set by climate rather than by design. Shallow frost depth keeps foundations cheap, while UV and heat make coating maintenance intervals the real ownership cost. Renolume models the excavation accordingly, and the footing inspection hold point — not the carpentry — is normally what stretches a deck project across weeks. Total modelled elapsed window: 21 days to 70 days.

What local factors change this number in Dallas?

Hail frequency: Impact-rated assemblies are a mainstream decision here and can affect insurance treatment as well as survival. Heat and UV: Sustained summer attic temperatures and high UV shorten the life of low-grade materials and make ventilation cost-relevant. Storm-cycle demand: Prices and lead times move sharply after a hail event, independently of the underlying cost base. Municipal fragmentation: Dozens of separate authorities across the metroplex, each with their own process and requirements. All three published indices behind those factors are stated on this page — labour 0.96, material 0.99, permit 0.9 — and 2 day(s) of local weather buffer are carried in the timeline. Site access, storey height and existing conditions are modelled separately in the planner because they are property-specific, not city-specific.

Is it worth repairing instead of a full deck construction?

A targeted repair is normally worth it when the failure is isolated and the rest of the assembly still has service life. Once the damaged share approaches roughly a third of the whole, repair economics collapse — you pay set-up, access and disposal twice, and the two halves age differently. Model the full job at $13,700 – $29,100 first, then compare a quoted repair against it rather than against a national average.

How accurate is this estimate for Dallas?

This page carries a confidence score of 100/100 (High confidence) for a generic property, because it assumes a standard case rather than yours. Wage data for Dallas is measured sample quality (CBSA 19100), which is one of the 5 stated factors behind the score. Answering the planner questions raises it, because the model then has real inputs instead of defaults.

Where does the Dallas cost data come from?

Labour hours come from a fixed task library, wage rates from published government wage data at measured sample quality for Dallas, and regional movement from a labour index of 0.96, a material index of 0.99 and a permit index of 0.9. Nothing is scraped, crowd-sourced or supplied by a contractor. Data version v2026.1, effective 2026-04-01.

Assumptions, exclusions and data sources

These are the model's standing assumptions for a Dallas property. Where local practice overrides them — permits, inspections, season — that is set out in the Dallas sections above.

What this model assumes
  • Footings are assumed at one per 48 sq ft of deck area with a minimum of four.
  • Footing depth follows the local frost line recorded for your region.
  • Pressure-treated decks require re-staining every 2–3 years; that recurring cost is shown separately, not in the build total.
What is excluded
  • Retaining walls, grading or drainage work
  • Roof structures, pergolas and screening
  • Hot tub structural reinforcement
  • Utility relocation beneath the deck footprint
Data sources
  • Published government occupational wage data for Dallas (measured sample quality, CBSA 19100), scaled by a labour index of 0.96.
  • A fixed task and productivity library — 80.5 modelled hours across 3 trades — rather than contractor-supplied prices.
  • Regional material index 0.99 and permit fee index 0.9 for Texas.
  • Engine version 2.0.0, data version v2026.1, effective 2026-04-01. Nothing is scraped, crowd-sourced or quoted by a contractor.

Full methodology

The same project in other metros

Get this priced for your actual house

Answer six questions and the range narrows to your property, your access, your existing conditions.

Planning estimate only. This is not a quote, bid or appraisal. Ranges reflect typical market conditions for the stated data version and do not account for site-specific concealed conditions, local code interpretation or contractor availability. Always obtain written bids. Data version v2026.1. Last updated . Methodology.